The message below is copy/pasted from an e-mail:
I’m reaching out to the B.I.K.E.S. Club of Snohomish County to see if there was someone in the club who would be interested in being part of a steering committee for a Bicycle / Pedestrian improvement project in design for 5th Street in Mukilteo. I’ve attached a brief which provides some project background. We would like someone who has an interest in the project and can commit to participating in four meetings.
The draft meeting schedule follows. I expect at least the first two meetings to be virtual. If we meet in person for the last two meetings, the location would be in Mukilteo.
- Early to mid-May first meeting
- mid-June to go over the early public outreach findings and follow up on steering committee thoughts from the first meeting
- late Fall to go over the 60% design plan
- late May 2022 to review the 90% design if the group is interested in continuing the conversation
Please feel free to share this information with potential steering committee members.
Let me know if you have any questions.
Regards,
Connie
Connie Bowers, P.E.
Public Works | Assistant City Engineer
cbowers@mukilteowa.gov | 425.263.8080
425.263.8000 | 425.212.2068 (fax) | www.mukilteowa.gov